Monday, September 7, 2026
73.44 °f
Magee
  • About Us
  • Our Team
  • Terms of Service
  • Privacy Policy
  • Advertising
  • Contact Us
No Result
View All Result
MageeNews.com
Advertisement
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
No Result
View All Result
MageeNews.com
No Result
View All Result
Home News Mississippi News

NASA Readies for Future Artemis Moon Missions with Rocket Engine Test Series

Patrice Boykin by Patrice Boykin
October 1, 2021
in Mississippi News, News
0
NASA Readies for Future Artemis Moon Missions with Rocket Engine Test Series
0
SHARES
23
VIEWS
Share on FacebookShare on Twitter

Please note that this post contains affiliate links and any sales made through such links will reward MageeNews.com a small commission – at no extra cost to you.

NASA Readies for Future Artemis Moon Missions with Rocket Engine Test Series

 

NASA marked a significant milestone Sept. 30 in its plans for future missions to the Moon and, eventually, Mars with completion of an RS-25 single-engine Retrofit-2 test series at Stennis Space Center near Bay St. Louis, Mississippi.

Related posts

Holiday Travel Period to begin December 31st

MHP 2026 Labor Day Holiday Travel Period

September 4, 2026
Officer Ty Easterling & Officer Brandon Cooper & Dispatchers Mikala Dampreere & Tanya McNair  rose to the occasion during weekend shooting.

Officer Ty Easterling & Officer Brandon Cooper & Dispatchers Mikala Dampreere & Tanya McNair rose to the occasion during weekend shooting.

September 3, 2026

 

A full-duration hot fire of RS-25 developmental engine No. 0528 on the A-1 Test Stand at Stennis culminated a seven-test series to support development and production of new engines for the agency’s Space Launch System (SLS) rocket on future missions.

 

“This successful test series for the Space Launch System RS-25 engine puts us one step closer to manufacturing the first new set of engines for future Artemis missions to the Moon,” said Johnny Heflin, manager of the SLS liquid engines office at NASA’s Marshall Space Flight Center in  Huntsville, Alabama. “We are testing engine parts made with advanced manufacturing techniques that can reduce the cost of each engine by more than 30 percent yet still maintain the RS-25 engine’s reliability and high performance.”

 

During the Sept. 30 hot fire, operators fired RS-25 developmental engine No. 0528, used for each of the seven tests in the series, for more than eight minutes (500 seconds), the same time required during an actual launch.

 

The test series provided valuable information to Aerojet Rocketdyne, lead contractor for the SLS engines, as it produces engines for use after the Artemis IV mission to the Moon. Operators collected hot fire data to demonstrate and verify various engine capabilities, and to evaluate new engine components manufactured with cutting-edge and cost-saving technologies and reduce operational risk.

 

Tested components included a 3D-printed pogo accumulator to dampen pressure oscillations that can cause flight instability and a main combustion chamber fabricated using a hot isostatic pressure (HIP) bonding technique. These components are significant early milestones in NASA’s and Aerojet Rocketdyne’s effort to maximize state-of-the-art manufacturing methods to significantly reduce the cost and time needed to build new RS-25 engines.

 

The Sept. 30 test was delayed from its original date due to impacts from Hurricane Ida, which struck the Gulf Coast region on Aug. 29. The storm initially impacted propellant deliveries to the center, necessitating a delay as suppliers recovered full capabilities.

 

“I am proud to see how the test team and our propellant suppliers overcame the impacts of Hurricane Ida to get us back to testing the RS-25,” Stennis RS-25 Project Manager Chip Ellis said. “With each test we learn more and more about the RS-25 engine and how it operates. And it is exciting to know that what we are doing contributes to the safety of the astronauts that will fly on SLS.”

 

Four RS-25 engines, along with a pair of solid rocket boosters, will help power SLS at launch. Firing simultaneously, the engines will generate a combined 1.6 million pounds of thrust at liftoff and 2 million pounds during ascent.

 

Previous RS-25 testing at Stennis began Jan. 9, 2015, and concluded April 4, 2019. During this period, NASA completed acceptance testing of former space shuttle main engines that will help power the first four SLS missions, conducted developmental and flightworthiness testing for all 16 new controllers (plus one spare) to be used on the heritage RS-25 engines, and demonstrated the ability of RS-25 engines to perform at the higher power level required to launch the super-heavy SLS rocket.

 

The first hot fire of the most current series was conducted on Jan. 28, 2021. Over the course of the seven-part test series, which coincided with Green Run testing of the SLS core stage at Stennis, developmental engine No. 0528 underwent 3,650 seconds of hot fire. The schedule included six full-duration, hot fire tests of more than eight minutes (500 seconds) and one hot fire of just under 11 minutes (650 seconds). A full-duration test refers to the time the engine must fire during an actual launch in order to power SLS towards orbit. Longer duration hot fires are conducted to test the limits of engine performance.

 

The Retrofit-2 test series followed major maintenance and upgrade projects on the A-1 Test Stand, including installation of a new NASA-designed-and-manufactured thrust vector control system on the structure that allows operators to “gimbal” test RS-25 engines, moving them on a tight circular axis. Gimbaling is a critical capability that ensures SLS can maintain a proper flight trajectory.

 

Operators are scheduled to begin a follow-up Retrofit-3 test series, using RS-25 developmental engine No. 0525, on the A-1 Test Stand later this fall. The new series will continue to collect data for new engine production.

 

NASA is building SLS as the world’s most powerful rocket. With Artemis, NASA will land the first woman and the first person of color on the lunar surface and establish long-term exploration at the Moon in preparation for human missions to Mars. SLS and the Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. The agency is working towards the launch of the Artemis I uncrewed flight test in upcoming months, which will pave the way for future missions.

 

RS-25 tests at Stennis are conducted by a combined team of NASA, Aerojet Rocketdyne and Syncom Space Services operators. Syncom Space Services is the prime contractor for Stennis facilities and operations.

 

SSC-20210930-s00218 – RS-25 Hot Fire Test cutline: NASA conducts a full-duration RS-25 hot fire test on the A-1 Test Stand at Stennis Space Center on Sept. 30. The hot fire of more than 8 minutes marked the final test of a Retrofit-2 series to support development and production of new engines for the agency’s Space Launch System.

 

For information about Stennis Space Center, visit:

www.nasa.gov/centers/stennis/

MageeNews.com is an online source serving Simpson and surrounding counties as well as the State of Mississippi.

Share this:

  • Email a link to a friend (Opens in new window) Email
  • Print (Opens in new window) Print
  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Reddit (Opens in new window) Reddit
  • Share on Tumblr (Opens in new window) Tumblr
Tags: MageeNews.comrocket
Previous Post

822 MS COVID Cases Reported

Next Post

FBI Launches Hate Crimes Awareness Campaign in Mississippi

Next Post
FBI - wanted class ring owner

FBI Launches Hate Crimes Awareness Campaign in Mississippi

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest News

Sarah N. Everage Austin, 84

by Sue Honea
September 6, 2026
0
Sarah N. Everage Austin, 84

Sarah N. Everage Austin, 84, passed away peacefully surrounded by her loving family, on September 2, 2026 in Orange Beach,...

Read moreDetails

Jimmy Lewis Ashmore Jr., 48

by Sue Honea
September 6, 2026
0
Jimmy Lewis Ashmore Jr., 48

Jimmy Lewis Ashmore Jr., 48, passed away at his home in Mize, Mississippi. Jimmy was born January 8, 1978, and...

Read moreDetails

“Really tough end to a really challenging week.” (Coach Chase Courtney)

by Sue Honea
September 6, 2026
0
“Really tough end to a really challenging week.” (Coach Chase Courtney)

Really tough end to a really one of the most challenging weeks of my career. I was proud of our...

Read moreDetails
Facebook Twitter Youtube RSS Instagram
MageeNews.com

MageeNews.com is THE source for news and views in Simpson County, Mississippi, and beyond.

Recent News

Sarah N. Everage Austin, 84

Sarah N. Everage Austin, 84

September 6, 2026
Jimmy Lewis Ashmore Jr., 48

Jimmy Lewis Ashmore Jr., 48

September 6, 2026
“Really tough end to a really challenging week.” (Coach Chase Courtney)

“Really tough end to a really challenging week.” (Coach Chase Courtney)

September 6, 2026
Magee, US
Monday, September 7, 2026
clear sky
73.44 ° f
89%
4.61mh
93.06 f 72.79 f
Tue
95.04 f 72.19 f
Wed
91 f 73.53 f
Thu
89.87 f 72.14 f
Fri

© 2023 MageeNews.com

No Result
View All Result
  • Home
  • Sue Stuff
  • News
  • Happenings
  • Schools
  • Sports
  • Obituaries
  • Ducks on the Pond
  • Videos

© 2023 MageeNews.com