Tuesday, August 4, 2026
68.45 °f
Magee
  • About Us
  • Our Team
  • Terms of Service
  • Privacy Policy
  • Advertising
  • Contact Us
No Result
View All Result
MageeNews.com
Advertisement
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
No Result
View All Result
MageeNews.com
No Result
View All Result
Home News Mississippi News

NASA Prepares for Green Run Testing, Practices Lifting SLS Core Stage

Patrice Boykin by Patrice Boykin
August 27, 2019
in Mississippi News, News
0
NASA Prepares for Green Run Testing, Practices Lifting SLS Core Stage
0
SHARES
17
VIEWS
Share on FacebookShare on Twitter

Please note that this post contains affiliate links and any sales made through such links will reward MageeNews.com a small commission – at no extra cost to you.

NASA cleared a milestone in preparation for Green Run testing of its Space Launch System (SLS) core stage with an Aug. 23/24 lift and installation of the core stage pathfinder simulator onto the B-2 Test Stand at Stennis Space Center near Bay St. Louis, Miss. The lift and installation of the core stage pathfinder – a size and weight replica of the SLS core stage – is helping teams at Stennis prepare for the Green Run test series. For this test of the new core stage, Stennis will lift the flight core stage for Artemis 1, the first SLS mission into the stand. SLS and the new Orion spacecraft being built are the foundation for NASA’s Artemis Program, which will send the first woman and next man to walk on the Moon by 2024.

Stennis modified the B-2 Test Stand for the core stage Green Run testing. The procedure involved lifting the core stage pathfinder from its horizontal position on the B-2 Test Stand tarmac with the facility boom crane line attached to the forward end and a ground crane line attached to the aft end. The pathfinder then was “broken over” into a vertical position. Once the ground crane line was disconnected, the core stage pathfinder was lifted into place by the stand boom crane. This “fit test” validated auxiliary lift equipment, procedures, and verified that stand modifications and preparations are in place and prepared for delivery and testing of the SLS core stage flight hardware.

 

Related posts

Simpson County Board of Supervisors Conducts August Meeting

Simpson County Board of Supervisors Conducts August Meeting

August 3, 2026
Gipson for Governor Campaign Releases Conservative Common Sense Plan for Mississippi

Gipson for Governor Campaign Releases Conservative Common Sense Plan for Mississippi

August 3, 2026

To prepare for the test, Stennis modified or upgraded every major area and system of the test stand, as well as the high-pressure industrial water system and high-pressure gas facility that support test operations. NASA is building the SLS flight core stage at its Michoud Assembly Facility in New Orleans and is scheduled for transport to Stennis by the end of the year. The stage recently completed a critical review in preparation for adding the last piece of the core stage structure: the engine section. After this piece is added, the four RS-25 engines can be connected to the stage. When the stage is completely assembled, NASA’s Pegasus barge will deliver it to Stennis. For the Green Run test, the core stage flight unit will be lifted and installed onto the B-2 stand, using procedures developed and practiced during the recent core stage pathfinder lift. NASA then will conduct a series of tests to check out stage systems and make sure all are working as needed. Once systems are checked, NASA will conduct a full hot fire test of the stage, firing its four RS-25 engines simultaneously, just as during an actual launch. The hot fire test will generate more than 2 million pounds of combined thrust and provide critical performance data needed to demonstrate the core stage design is flightworthy and ready for launch. Following necessary refurbishment of the stage, it will be transported by barge to Kennedy Space Center in Florida. At Kennedy, the stage will be mated with other SLS major elements and prepared for launch of the Artemis 1 mission.

PHOTO CREDIT – NASA or National Aeronautics and Space Administration

Share this:

  • Email a link to a friend (Opens in new window) Email
  • Print (Opens in new window) Print
  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Reddit (Opens in new window) Reddit
  • Share on Tumblr (Opens in new window) Tumblr
Tags: MageeNews.comnasa
Previous Post

AG Continues to Urge the FCC to Strengthen Efforts to Stop Robocalls

Next Post

Cindy Hyde Smith Visits Magee

Next Post
NASA Prepares for Green Run Testing, Practices Lifting SLS Core Stage

Cindy Hyde Smith Visits Magee

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest News

Simpson County Board of Supervisors Conducts August Meeting

by Sue Honea
August 3, 2026
0
Simpson County Board of Supervisors Conducts August Meeting

The Simpson County Board of Supervisors met Monday, August 3, 2026, with Board President Wayne Womack calling the meeting to...

Read moreDetails

Glenda Earlean Thompson Gilreath, 83 of Raleigh, Mississippi

by Sue Honea
August 3, 2026
0
Glenda Earlean Thompson Gilreath, 83 of Raleigh, Mississippi

Glenda Earlean Thompson Gilreath, 83, of Raleigh, Mississippi, passed away Sunday, August 2, 2026, at the Mississippi Care Center in...

Read moreDetails

Magee Lions Club Learns About Growing Need for Foster Families

by Sue Honea
August 3, 2026
0
Magee Lions Club Learns About Growing Need for Foster Families

The Magee Lions Club welcomed Roy Logan, a Foster Parent Recruiter with the Mississippi Department of Child Protective Services (MDCPS),...

Read moreDetails
Facebook Twitter Youtube RSS Instagram
MageeNews.com

MageeNews.com is THE source for news and views in Simpson County, Mississippi, and beyond.

Recent News

Simpson County Board of Supervisors Conducts August Meeting

Simpson County Board of Supervisors Conducts August Meeting

August 3, 2026
Glenda Earlean Thompson Gilreath, 83 of Raleigh, Mississippi

Glenda Earlean Thompson Gilreath, 83 of Raleigh, Mississippi

August 3, 2026
Magee Lions Club Learns About Growing Need for Foster Families

Magee Lions Club Learns About Growing Need for Foster Families

August 3, 2026
Magee, US
Tuesday, August 4, 2026
scattered clouds
68.45 ° f
87%
3.51mh
37%
97.25 f 71.46 f
Wed
96.96 f 72.66 f
Thu
97.05 f 71.91 f
Fri
91.76 f 73.63 f
Sat

© 2023 MageeNews.com

No Result
View All Result
  • Home
  • Sue Stuff
  • News
  • Happenings
  • Schools
  • Sports
  • Obituaries
  • Ducks on the Pond
  • Videos

© 2023 MageeNews.com