Sunday, January 18, 2026
54.5 °f
Magee
  • About Us
  • Our Team
  • Terms of Service
  • Privacy Policy
  • Advertising
  • Contact Us
No Result
View All Result
MageeNews.com
Advertisement
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
  • Home
  • Message from the Prez
  • News
  • Happenings
  • Obituaries
  • Sports
  • Schools
  • Videos
  • Ducks on the Pond
No Result
View All Result
MageeNews.com
No Result
View All Result
Home News Mississippi News

Stennis Begins Work on Key Testing Component

Patrice Boykin by Patrice Boykin
October 5, 2022
in Mississippi News, News
0
Stennis Begins Work on Key Testing Component
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Please note that this post contains affiliate links and any sales made through such links will reward MageeNews.com a small commission – at no extra cost to you.

A critical component needed for future testing in support of NASA’s Artemis missions to the Moon and beyond recently arrived at the agency’s Stennis Space Center in south Mississippi.

The interstage simulator special test equipment arrived at Stennis on Sept. 21 via barge from NASA’s Michoud Assembly Facility in New Orleans, Louisiana, where it was fabricated. The simulator, 31 feet in diameter and 33 feet tall, will be used during Green Run testing of the new Exploration Upper Stage (EUS). EUS will fly on future Space Launch System (SLS) missions as NASA continues its mission to explore the universe for the benefit of all.

Interstage Simulator
Sunrise offers a perfect frame for the interstage simulator component following its arrival at the B-2 Test Stand at NASA’s Stennis Space Center on Sept. 21, 2022. Stennis will use the unit during testing of the Exploration Upper Stage for NASA’s Space Launch System rocket.
Credits: NASA/Danny Nowlin
Interstage Simulator
The interstage simulator component to be used during Exploration Upper Stage testing for the Space Launch System rocket arrives at the B-2 Test Stand NASA’s Stennis Space Center on Sept. 21, 2022.
Credits: NASA/Danny Nowlin

EUS is being built at Michoud as a more powerful second stage to send the Orion spacecraft to deep space. It will replace the interim cryogenic propulsion stage being used on initial Artemis flights and enable NASA to send astronauts and large payloads to the Moon on a single mission.

Related posts

Mary Lucille Breaux, 77 of Braxton, Mississippi

Weekly Report from Representative Price Wallace for January 12, 2026

January 16, 2026
Senator Andy Berry’s Weekly Report, Friday, February 14, 2025

Senate Andy Berry Weekly Report, Friday, January 16, 2026

January 16, 2026

 

The new upper stage will be powered by four RL10 engines, generating a combined 97,360 pounds of thrust, compared to the single engine used on the interim stage. That will allow NASA to send 40% more payload to the Moon, 38 metric tons compared to 27 metric tons on initial missions.

 

EUS is expected to fly on the Artemis IV mission. Prior to that time, it will undergo Green Run testing on the B-2 Test Stand at Stennis, where the SLS core stage also was tested. During Green Run, NASA will conduct a series of tests on the EUS integrated systems to demonstrate it is ready to fly.

The interstage simulator recently delivered to Stennis is essential to enable the series of tests. The Green Run effort will culminate with a hot fire of the four RL10 engines, just as during an actual mission.

The interstage simulator will serve dual purposes. Most importantly, it will function much like the SLS interstage section to protect the lower part of the EUS vehicle from the environment, keeping the electrical and propulsion systems safe while at Stennis. The top portion of the simulator also will serve as a thrust takeout system to absorb the thrust of an EUS hot fire and transfer it back to the test stand.

In the coming months, the Stennis team will perform finishing work to prepare the simulator for installation on the test stand. This will include finishing access platforms and the precision interfaces prior to sandblasting and painting. The final step prior to installation will be installing various piping and tubing, as well as wiring connections needed for Green Run testing.

Interstage Simulator
A drone photo shows the interstage simulator component sitting on the tarmac of the B-2 Test Stand at NASA’s Stennis Space Center on Sept. 21, 2022. In upcoming weeks, Stennis will prepare the unit to be installed on the stand to support testing of the Exploration Upper Stage for NASA’s Space Launch System rocket.
Credits: NASA/Danny Nowlin

“As NASA looks to gain a better understanding of the universe, important projects like this need to occur, …” explained Stennis Project Engineer Nick Nugent. “Stennis is on the front lines … with our rocket engine testing, our component testing, and then also our stage testing, like we did with the (SLS) core stage Green Run. It’s an exciting time to be here.”

For information about Stennis Space Center, visit:

www.nasa.gov/centers/stennis/

MageeNews.com is an online news source serving Simpson and surrounding counties as well as the State of Mississippi.
Tags: MageeNews.commoonnasastarsstennis
Previous Post

Magee Monument Open House

Next Post

RE-Elect David Shoemake Chancery Judge

Next Post
RE-Elect David Shoemake Chancery Judge

RE-Elect David Shoemake Chancery Judge

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest News

Former Simpson Academy Standout Matt Adcock Signs with University of Arkansas

by Sue Honea
January 17, 2026
0
Former Simpson Academy Standout Matt Adcock Signs with University of Arkansas

Former Simpson Academy Cougar Matt Adcock has signed and enrolled to continue his football career at the University of Arkansas,...

Read moreDetails

Will you be ready?

by Sue Honea
January 17, 2026
0
Stand firm in your faith.  By Sharon Womack

The passage of Scripture selected for today is found in Luke 12:40: "You also must be ready, because the Son...

Read moreDetails

Lady Cougar Coach Linda Dear Honored for 50 Years of Coaching Excellence

by Sue Honea
January 17, 2026
0
Lady Cougar Coach Linda Dear Honored for 50 Years of Coaching Excellence

Simpson County Academy Lady Cougar head basketball coach Linda Dear was honored for an extraordinary milestone, celebrating 50 years of...

Read moreDetails
Facebook Twitter Youtube RSS Instagram
MageeNews.com

MageeNews.com is THE source for news and views in Simpson County, Mississippi, and beyond.

Recent News

Former Simpson Academy Standout Matt Adcock Signs with University of Arkansas

Former Simpson Academy Standout Matt Adcock Signs with University of Arkansas

January 17, 2026
Stand firm in your faith.  By Sharon Womack

Will you be ready?

January 17, 2026
Lady Cougar Coach Linda Dear Honored for 50 Years of Coaching Excellence

Lady Cougar Coach Linda Dear Honored for 50 Years of Coaching Excellence

January 17, 2026
Magee, US
Sunday, January 18, 2026
scattered clouds
54.5 ° f
45%
3.47mh
25%
66 f 45 f
Wed
68 f 40 f
Thu
71 f 44 f
Fri
75 f 46 f
Sat

© 2023 MageeNews.com

No Result
View All Result
  • Home
  • Sue Stuff
  • News
  • Happenings
  • Schools
  • Sports
  • Obituaries
  • Ducks on the Pond
  • Videos

© 2023 MageeNews.com