Please note that this post contains affiliate links and any sales made through such links will reward MageeNews.com a small commission – at no extra cost to you.
Magee High School Press Box received a much needed facelift and remodel.
No longer will anyone be allowed to film and view from top of press box. A new slanted tin roof has been attached.
First floor has four new windows, flooring, counter and walls. A door divides the announcer and spotter from the officials for time clock and twenty-five second clock.
The Second floor also has new flooring windows, dividers, counter and walls. A door to divide the home team coaches and the visiting team coaches and filming crew. Two windows will be allowed for the home team to video and spot, same for visiting team.
New outside insulated entrance doors were added, and new air conditioning has been installed on each floor.
Jeffery Walker and his maintenance crew did an excellent job on the remodel.